Skip to short-horizon research
Short Term Trading StrategiesCondition / Request / Position

Research reading order

Use the turnover guide and worksheet to separate per-side, round-trip and fixed cash costs. Move to the calendar guide before planning session exits.

Original editorial revision: 9 October 2026. Expanded edition: 14 October 2026.

Educational execution planning. Invented costs and clocks are assumptions, not forecasts, broker instructions or a measured strategy record. Check the exact venue, instrument and account rules.

Begin with cost units

Use the turnover guide and worksheet to separate per-side, round-trip and fixed cash costs. Move to the calendar guide before planning session exits.

Finish with the journal

Read order-state handling alongside the retained detailed journal and its blank CSV. Preserve attempts, rejected orders and late fills as well as completed trades; the missing events often determine whether a result is believable.

Library

The short-horizon source contract

Start with venue/product identity, session date, named timezone, original observation source and availability. State the prior rule, invalidation and boundary before checking outcomes. Preserve missed opportunities, no-trade states and failed comparisons. A completed condition is not automatically an executable order. If required context is missing, record unresolved rather than assigning a convenient price. The three filled setup cards use the same fields for their authored examples so the missing branch is as inspectable as the admitted one. None is a calibrated entry model or independent financial sample.

One position can remain unfinished

The amount packet fixes ten invented original units at entry 100. Exit fragments of four at 102 and three at 99 leave three units. A mark of 98 gives negative six on the remainder; all incurred fees are 1.7. The total marked price/fee amount is negative 2.7, not a closed trade. A cancellation acknowledgement for an order remainder would not change that open quantity. Keep original position, current order state and unique execution IDs as different evidence objects. Actual quantities and timestamps are not supplied by this briefing exercise.

Three distinct calculations

The legacy clock answers the earlier of maximum hold and pre-close cutoff on a single entered day. The turnover budget answers repeated constant-notional round-trip arithmetic. The new lens answers a fixed position's two-fragment snapshot with an open mark and original-risk denominator. Combining one tool's convenient quantity, another's time and a selected favourable path would create a new unverified study. Genuine instrument research, account permissions, production exit ownership and independent completion remain separate tasks. The brief records their missing sources without pretending a neat worksheet is the full result.

Filled setup and position references